Friday, June 15, 2007

Room Preparation

Almost all of our time over the last week has been spent preparing the exhibition room for the final show. The room had fake walls put up, creating a more suitable shape, these walls then needed to be scraped and painted white.

Once dry we had to install the correct number of PC’s, and televisions into the room and ensure that they all work properly.

For my individual piece I needed to measure out shelves for the monitor and web cam to sit on and construct a second wall to enable the camera to work properly. These then had to also be painted white to tie in with the rest of the room.

Posters and wall art then had to be lined up and stuck into place, before testing the overall lighting and sound quality within the room.

Finally after tiding the whole room up the floor had to be painted, covering up all the scratch and old paint makes giving the room an overall professional look.

No comments: